Sacramento City General Plan Update and Climate Action Plan – Comments due Nov 4, 2019

The City of Sacramento has issued a Revised Notice of Preparation (NOP) of a Master Environmental Impact Report (MEIR) for the City of Sacramento 2040 General Plan Update and Climate Action Plan.

The City is initiating the 2040 General Plan Update and Climate Action Plan, consistent with the City’s requirement to revise and update the General Plan every five years, as necessary, to address significant emerging trends, recent state statutes, new issues, and to update the status of implementation measures.

As lead agency, the City of Sacramento has issued a Revised NOP to inform trustee and responsible agencies, and the public, of the decision to undertake preparation of a MEIR and to provide information and clarification for the General Plan Update and MEIR as to the existing designated Special Study Areas that are in physical proximity to the city limits. These study areas on the edge of the city were previously defined by the City over a decade ago as unincorporated areas that are of interest to the City, as the planning of the areas necessitates interjurisdictional cooperation with Sacramento County and other entities.

The Revised NOP is available on the City’s Community Development Department webpage.

The Revised NOP circulation period is from October 3, 2019 to November 4, 2019. Written comments on the scope of the MEIR will be accepted until 4 p.m. on Monday, November 4, 2019.

Please submit comments to:

Scott Johnson, Senior Planner
Community Development Department
300 Richards Boulevard, Third Floor
Sacramento, CA 95811
Email: srjohnson[at]cityofsacramento[dot]org

Additional information on the 2040 General Plan Update and Climate Action Plan is available here.

Image found at https://commons.wikimedia.org/wiki/File:Sacramento_from_Riverwalk.jpg

Problems with Galt Climate Action Plan

On September 30, 2019, the Environmental Council of Sacramento, 350 Sacramento and the Sierra Club submitted a letter compiling comments on the Climate Action Plan proposed by the City of Galt.

Below are some excerpts from the letter.

Local climate action is important because the largest sources of greenhouse gas emissions (GHG), in the City of Galt as well as statewide, are building energy [use] and on-road vehicle travel.
Both are best and most directly controlled locally, by adopting energy-efficient building codes and requiring efficient development that reduces the need for auto “vehicle miles traveled” (VMT).

There is no longer any rational doubt that climate change is adversely affecting the livability of our planet now; that physical environmental effects will grow increasingly serious in coming decades; and that without major, timely GHG-reductions, they will cause grave public health impacts and severe economic and social disruptions in the lifetimes of children alive today.
We appreciate the difficulties transitioning from the long-accustomed land use and building models that have contributed to climate change to sustainable ones, and doing it quickly. But the exigencies of climate change, as reflected in State law, require broad and decisive change in how we use and think about energy. The required adjustments will bring many co-benefits, and we no longer have the luxury of delayed or token efforts.
Our organizations are committed to working with Galt in every productive way we can. We look forward to ongoing engagement in the City’s administrative process and may provide specific suggestions in future comments

Click here to read the comment letter in full.

Image credit: https://www.ecolife.zone/

Sacramento Two Rivers Trail Bike Trail

On September 12, 2019, ECOS and Habitat 2020 submitted a comment letter on the Sacramento Two Rivers Trail (Phase II) DEIR.

The Two Rivers Trail Phase II project will provide a 2.4 mile long multi-use path between Sutter’s Landing Park and H Street, by Sacramento State. The trail will provide residents of River Park and East Sacramento a safe, convenient, and protected path into downtown Sacramento. The overall vision is to eventually have the trail connect to the Sacramento River Parkway and create a continuous trail system along both sides of the Sacramento and American Rivers. In addition, the project will environmentally clear the next phase of the trail between Sutter’s Landing Park and the Sacramento Northern Bike Trail.

https://www.cityofsacramento.org/Public-Works/Engineering-Services/Projects/Current-Projects/Two-Rivers-Trail-Phase-II

There are many habitat issues that remain unaddressed in the Draft Environmental Impact Report.

The bottom line is that a bike trail on a levee is not only feasible, but it is the best option for the Two Rivers Trail if we want to protect the American River Parkway and its ecosystems. There are numerous other benefits to putting the trail on top of the levee as well, such as better access during winter floods.

Click here to read the letter in full.

Placer County Sustainability Plan Comments

On September 05, 2019, ECOS and 350 Sacramento wrote a comment letter to the Placer County Community Development Resources Agency in regards to the Placer County Sustainability Plan.

Below are a couple of excerpts from the letter, click the link below to read the full letter.

We encourage all efforts to expedite the transition to a carbon-free economy and are gratified by the County’s aspiration to be a leader in reducing greenhouse gas (GHG) emissions. We offer these comments in the hope they will help the County reach that goal.

It is evident from the draft Plan’s strong monitoring and update commitments that it is meant to be a “living” document, subject to ongoing community dialogue and further refinement. We look forward to working with the County to advance the Plan’s important role in mitigating climate change.

Click here to view the comment letter in full.

Save Hinkle Creek

Preserving the Hinkle Creek Nature Area is vital to the success of the Hinkle Creek Center. The Hinkle Creek Center was built with a $740,000.00 public investment and a promise that the Hinkle Creek Center Nature Area would be preserved to interpret the natural, cultural and historical resources, and provide a recreational program space.  Save Hinkle Creek is actively working with Folsom City to finally fulfill the mission and purpose of the Center with upcoming nature, history and cultural programs, as well as guided hikes. Cutting down the oak woodland would greatly diminish the many stories waiting to be brought to life and enjoyed by everyone. The trees are our past, present and future!

HOW YOU CAN HELP!
We need all lovers of trees, creeks, wildlife and history to come and speak up for Alternative #1, the no-dig, increased maintenance and monitoring alternative, which ensures that the existing sewer line is maintained to the highest degree while still preserving the Hinkle Creek Nature Area.

The Folsom City Council meeting is on Tuesday, September 10 at 6:30 p.m.
Located on 50 Natoma Street, Folsom, CA 95630.

If you cannot attend the meeting, please contact the City Council members and simply state:
“I support Alternative #1, the no-dig, increased maintenance and monitoring alternative, to save the oak trees in the Hinkle Creek Nature Area. As far back as 1984 the value of this creek corridor was recognized by the Folsom City Parks and Recreation Commission along with the local neighborhood associations, and it remains just as important, if not more so today.”

For more detailed information on Hinkle Creek, please go to:
https://www.savehinklecreek.com/

Save the Pond at the Old Arena Site!, Aug 2019

In August 2019, Christy Berger of Sacramento Heron and Egret Rescue presented to Habitat 2020 on an active wildlife habitat that has been discovered the Sleep Train Arena property in Natomas. At this time, the property is owned by the owners of the Sacramento Kings professional basketball team.

Here’s a summary from Sacramento Heron and Egret Rescue’s website:

We were stunned when we first viewed the huge numbers of herons and egrets nesting at the pond, and overjoyed that they were nesting in a much better site than in a city neighborhood like many other nesting colonies, and are safe from cars and people. But they may not be safe for long if the property owners fail to preserve the pond. Below are some views of the pond and the wildlife that call it home (there are more than just herons and egrets!) You will notice some concrete structures and rebar. We found out that this site is an unfinished baseball stadium built in 1990. Because of the high water table in North Natomas, the excavated area filled in and over the years with trees and other foliage, creating nice wetland habitat.

Learn more

Click here to visit the website of Sacramento Heron and Egret Rescue. There you can learn more about the birds living at the old arena site and why the plans for this property should include preservation of this habitat chosen by the birds themselves, rather than further destruction of their habitat opportunities.

December 2019

On December 9th, ECOS/Habitat 2020 partnered with Sacramento Heron and Egret Rescue to submit comments to the city regarding the Arco Arena Reuse Plan. Click here to view the letter.

Photos by J. Roberson Photography